Sıra No | İş Kalemi No | Açıklama | Birimi | Miktarı |
---|
1 | 15.006/3C | MAKİNA İLE HER DERİNLİKTE DAR DERİN YUMUŞAK VE SERT KÜSKÜLÜK ZEMİNİN KAZILMASI | M3 | 4050,370 |
2 | 15.140/2 | TEMEL TABANINA VE BORU ÜSTÜNE EL İLE KUM-ÇAKIL SERİLMESİ
| M3 | 980,000 |
3 | 16.044/4 | GRONÜL.KUM-ÇAKILLA YAP.DEMİRLİ BS.20 BETONU
| M3 | 10,000 |
4 | 16.003 | 250 DOZLU DEMİRSİZ BETON
| M3 | 11,700 |
5 | 16.058/1A | BS.20 HAZIR BETON
| M3 | 20,000 |
6 | 21.011 | BETONARME KALIP YAPILMASI
| M2 | 50,000 |
7 | 23.001/1 | ø 8-ø 12 MM İNCE BETONARME DEMİRİN BÜKÜLÜP DÖŞENMESİ
| TON | 3,000 |
8 | 18.376 | 400-500 MM2 FUGADA NEOPREN ESASLI MACUNLA SU YALITIMI
| MT | 36,000 |
9 | 204.1003 | SABİT CONTALI PVC PİS SU BORUSU ø 100 mm.
| MT | 42,000 |
10 | 04.287 | FONT BORULAR (70-300 MM)
| KG | 100,000 |
11 | 04.524/07 | SU BAZLI DUVAR BOYASI
| KG | 5,090 |
12 | 210.715 | KÜRESEL VANA 300 mm.
| AD | 2,000 |
13 | 16.002 | 200 DOZLU DEMİRSİZ BETON
| M3 | 10,000 |
14 | 27.501 | ALT 250-ÜST 300 KG.ÇİMENTO DOZLU DÜZ SIVA YAPIMI
| M2 | 50,000 |
15 | 21.054 | AHŞAP KALIP İSKELESİ (EN YÜKSEK 4 M)
| M3 | 10,000 |
16 | 17.136 | OCAK TAŞI İLE BLOKAJ
| M3 | 30,000 |
17 | 27.586 | 4 CM KALINLIĞINDA 500 KG ÇİMENTO DZ ŞAP YAPIMI
| M2 | 95,000 |
18 | 23.176 | ÇEŞİTLİ DEMİR İŞLERİ YAPILMASI VE YERİNE KONULMASI
| KG | 350,000 |
19 | ÖZEL | İŞLETME PLANI YAPILMASI | MT | 1400,000 |
20 | 04.290/64 | ø 200 mm KORUGE KANALİZASYON BORULARI
| MT | 14,000 |