Sıra No | İş Kalemi No | Açıklama | Birimi | Miktarı |
---|---|---|---|---|
1 | E1 | KESİCİ - 170 kV, 2000 A, 31.5 kA, TEKRAR KAPAMALI (Malzeme) | adet | 1 |
2 | E1.1 | KESİCİ - 170 kV, 2000 A, 31.5 kA, TEKRAR KAPAMALI (Montaj) | adet | 1 |
3 | E2 | NORMAL AYIRICI - 170 kV, 2000 A, 31.5 kA, MOTOR KUMANDALI (Malzeme) | adet | 1 |
4 | E2.1 | NORMAL AYIRICI - 170 kV, 2000 A, 31.5 kA, MOTOR KUMANDALI (Montaj) | adet | 1 |
5 | E3 | TOPRAK BIÇAKLI AYIRICI - 170 kV, 2000 A, 31.5 kA, MOTOR KUMANDALI (Malzeme) | adet | 1 |
6 | E3.1 | TOPRAK BIÇAKLI AYIRICI - 170 kV, 2000 A, 31.5 kA, MOTOR KUMANDALI (Montaj) | adet | 1 |
7 | E4 | AKIM TRAFOSU - 170 kV, 400-800-1200-1600/1-1-1 A, 31.5 Ka, (10+30+30) VA (Malzeme) | adet | 3 |
8 | E4.1 | AKIM TRAFOSU - 170 kV, 400-800-1200-1600/1-1-1 A, 31.5 Ka, (10+30+30) VA (Montaj) | adet | 3 |
9 | E5 | GERİLİM TRAFOSU - 150/V3:0.1/V3:0.1/V3:0,1/3 ,10 +10+10 VA (Malzeme) | adet | 3 |
10 | E5.1 | GERİLİM TRAFOSU - 150/V3:0.1/V3:0.1/V3:0,1/3 ,10 +10+10 VA (Montaj) | adet | 3 |
11 | E6 | BARA VE CİHAZLAR ARASI BAĞLANTI - 795 MCM (Malzeme) | metre | 400 |
12 | E6.1 | BARA VE CİHAZLAR ARASI BAĞLANTI - 795 MCM (Montaj) | metre | 400 |
13 | E7 | TOPRAKLAMA İLETKENİ - 95 mm2 ÖRGÜLÜ BAKIR İLETKEN (Malzeme) | metre | 200 |
14 | E7.1 | TOPRAKLAMA İLETKENİ - 95 mm2 ÖRGÜLÜ BAKIR İLETKEN (Montaj) | metre | 200 |
15 | E8 | TOPRAKLAMA KAZIĞI - 2.5 m BOYUNDA, 22 mm ÇAPLI, 3 mm BAKIR KAPLI (Malzeme) | adet | 6 |
16 | E8.1 | TOPRAKLAMA KAZIĞI - 2.5 m BOYUNDA, 22 mm ÇAPLI, 3 mm BAKIR KAPLI (Montaj) | adet | 6 |
17 | E9 | KUMANDA VE KORUMA KABLOLARI (*) (Malzeme) | lot | 1 |
18 | E9.1 | KUMANDA VE KORUMA KABLOLARI (*) (Montaj) | lot | 1 |
19 | E10 | MESNET İZOLATÖRÜ - 170 kV, C4-750, HARİCİ (Malzeme) | adet | 3 |
20 | E10.1 | MESNET İZOLATÖRÜ - 170 kV, C4-750, HARİCİ (Montaj) | adet | 3 |
21 | E11 | KUMANDA PANOSU - 154 kV, DONANIMLI (Mevcut Fiderlerin Aktarımı TEİAŞ tarafından yapılacaktır.) (Malzeme) | adet | 2 |
22 | E11.1 | KUMANDA PANOSU - 154 kV, DONANIMLI (Mevcut Fiderlerin Aktarımı TEİAŞ tarafından yapılacaktır.) (Montaj) | adet | 2 |
23 | E12 | RÖLE PANOSU - 154 kV, DONANIMLI (2 FİDERLİK) (Malzeme) | adet | 1 |
24 | E12.1 | RÖLE PANOSU - 154 kV, DONANIMLI (2 FİDERLİK) (Montaj) | adet | 1 |
25 | E13 | SENKRONİZASYON ÜNİTESİ PANOSU - AÇI,FREKANS,GERİLİM (MEVCUT FİDERLER TEİAŞ YAPACAKTIR.) (Malzeme) | adet | 1 |
26 | E13.1 | SENKRONİZASYON ÜNİTESİ PANOSU - AÇI,FREKANS,GERİLİM (MEVCUT FİDERLER TEİAŞ YAPACAKTIR.) (Montaj) | adet | 1 |
27 | E14 | SAHA DAĞITIM KUTUSU - 60x80x120 cm ÖLÇÜLERİNDE (Malzeme) | adet | 1 |
28 | E14.1 | SAHA DAĞITIM KUTUSU - 60x80x120 cm ÖLÇÜLERİNDE (Montaj) | adet | 1 |
29 | E15 | HARİCİ ŞALT AYDINLATMA - 100 W DC AKKOR FLAMANLI ARMATUR ILE KOMPLE (Malzeme) | adet | 2 |
30 | E15.1 | HARİCİ ŞALT AYDINLATMA - 100 W DC AKKOR FLAMANLI ARMATUR ILE KOMPLE (Montaj) | adet | 2 |
31 | E16 | HARİCİ ŞALT AYDINLATMA - 250 W AC CIVA BUHARLI ARMATUR ILE KOMPLE (PİLON ÜZERİNE KONULACAK) (Malzeme) | adet | 2 |
32 | E16.1 | HARİCİ ŞALT AYDINLATMA - 250 W AC CIVA BUHARLI ARMATUR ILE KOMPLE (PİLON ÜZERİNE KONULACAK) (Montaj) | adet | 2 |
33 | E17 | FİZİKİ PROJE YAPIMI (TEK HAT DAHİL) - AS BUILD PROJELERİN VERİLMESİ İLE ÖDENECEKTİR | lot | 1 |
34 | E18 | SEKONDER PROJE YAPIMI - AS BUILD PROJELERİN VERİLMESİ İLE ÖDENECEKTİR | lot | 1 |
35 | E19 | GÜÇ ANALİZÖRÜ - YEDEK MALZEME (MEVCUT FİDERLER) 1A. 100 V AC, 2 Adet 0-20 mA ve 4-20 mA ayarlanabilir çıkışlı, 110 V DC Beslemeli (Malzeme) | adet | 2 |
36 | E20 | AMPERMETRE (TRANSDUSERLİ) - YEDEK MALZEME | adet | 2 |
37 | E21 | KORUMA RÖLELERİ ERİŞİM ARAYÜZ KABLOSU (Malzeme) | adet | 1 |
38 | E22 | ADAPTÖR GERİLİM TRAFOSU - 110/110 V; 10 VA;CL:0.2 (Malzeme) | adet | 1 |
39 | E22.1 | ADAPTÖR GERİLİM TRAFOSU - 110/110 V; 10 VA;CL:0.2 (Montaj) | adet | 1 |
40 | E23 | VOLTMETRE - YEDEK MALZEME | adet | 1 |
41 | E24 | KESİCİ ANAHTARI - YEDEK MALZEME | adet | 2 |
42 | E25 | AYIRICI ANAHTARI - YEDEK MALZEME | adet | 4 |
43 | E26 | SENKRON ANAHTARI - YEDEK MALZEME | adet | 1 |
44 | E27 | İHBAR BLOĞU (16'LI) - YEDEK MALZEME (MEVCUT FİDERLER) | adet | 2 |
45 | E28 | DEMONTAJ - 170 kV'luk Primer -sekonder malzeme ile Gergi ve Askı Takımı hırdavatı Demontajı ve Merkezde Grup Müdürlüğüne Teslimi | adet | 1 |
46 | İ1 | K4 tipi şalt sahası kablo kanallarının betonarme kapakları ile birlikte yapılması | metre | 12 |
47 | İ2 | K6 tipi şalt sahası kablo kanallarının betonarme kapakları ile birlikte yapılması | metre | 6 |
48 | İ3 | 154 kV ayırıcı, akım trafosu, gerilim trafosu, parafudr, hat tıkacı ve mesnet izolatörü temelleri yapılması | adet | 11 |
49 | İ4 | Çelik konstrüksiyon pilon temelleri yapılması | metreküp | 35 |
50 | İ5 | 154 kV kesici mesnet temelleri yapılması | adet | 1 |
51 | İ6 | Beton imalatın kırılması, atılması, nakli (sökülen temellerin geri dolgusunun yapılması fiyata dahildir) | metreküp | 5 |
52 | İ7 | Şalt sahası etrafında telçit beton babaları imalatı ve dikilmesi | adet | 3 |
53 | İ8 | Beton baba sökülmesi,atılması, nakli (payandalar dahil) | adet | 3 |
54 | İ9 | Şalt sahası etrafına fens çekilmesi ( imalat ve montaj bedeli ) | kilogram | 15 |
55 | İ10 | Fens sökülmesi, atılması, nakli | kilogram | 13 |
56 | İ11 | İstimlak sınırı ve şalt sahası etrafına galvanizli dikenli tel çekilmesi ( 3 kat ) ( imalat ve montaj bedeli ) | kilogram | 3 |
57 | İ12 | Topraklama kanalları | metre | 30 |
58 | İ13 | Betonarme Kablo Kanal Kapağı 45*50 cm yapılması (demontaj, molozların atılması ve yeni yapılan kapağın yerlerine tespiti, artan kapaklararın istiflenmesi) | adet | 25 |
59 | İ14 | Betonarme Kablo Kanal Kapağı 120*50 cm yapılması (demontaj, molozların atılması ve yeni yapılan demirli kapağın yerlerine tespiti, artan kapaklararın istiflenmesi) | adet | 13 |
60 | İ15 | Çelik konstrüksiyon imalatı (Şalt sahası çelik konstrüksiyon işleri, kumanda odası galeri katındaki kablo rafları ve tavaları, kablo kanallarındaki topraklama için boyuna konulacak L profiller) | kilogram | 2.500 |
61 | İ16 | Çelik konstrüksiyon montajı (Şalt sahası çelik konstrüksiyon işleri, metal clad galeri katındaki kablo rafları ve tavaları, kablo kanallarındaki topraklama için boyuna konulacak L profiller) | kilogram | 2.500 |
62 | İ17 | İnşaat Projeleri Yapılması (Bedeli As Build Projelerin Verilmesi İle Ödenecektir) | lot | 1 |