# | Kalem | Miktar | Birim |
---|---|---|---|
1 | 0.50 Mm Alt Temel Malzemesi | 6.500 | TON |
2 | C 20 Beton | 75 | METREKÜP |
3 | C 25 Beton | 75 | METREKÜP |
# | Kalem | Miktar | Birim |
---|---|---|---|
1 | 0.50 Mm Alt Temel Malzemesi | 6.500 | TON |
2 | C 20 Beton | 75 | METREKÜP |
3 | C 25 Beton | 75 | METREKÜP |